
Engineering resin molding, insert molding, sub-assembly and kitting


Price¥0.18
MOQ5000 pieceStock:0 piece
Colored PET Preform and Wide Mout
¥0.04/piece
Bagged and Sorted Molded Parts Ki
¥0.02/piece
Custom PP and ABS Molded Componen
¥0.28/piece
PET Preform Family with Plus Minu
¥0.04/piece
Overmoulded Grip and Handle Sub-A
¥0.85/piece
Unassembled Injection Moulded Com
¥0.18/piece
Ultrasonic Welded Pump Housing an
¥1.15/piece
PET Preform 24/410 Neck Injection
¥0.03/piece
Moulded Plastic Sub-Assemblies Ge
¥1.15/piece
This is the supply model where we mould the parts, you build the product. It suits buyers who want to keep the final assembly close to their market, who already run an assembly line, or who need to ship components flat to reduce freight volume. We supply every part loose, degated and cleaned, with the assembly interface documented.
Shipping an assembled product means shipping air. A flat-pack housing costs a fraction of the freight of the same housing closed, and the buyer avoids the duty and damage risk of a finished unit. Assembly is also where labour is cheapest, which is rarely the same place as the tooling, so splitting moulding from assembly is usually a cost decision as much as a logistics one.
| Materials | ABS, PP, PC, PC/ABS, PA6, PA66, POM, PMMA |
|---|---|
| Part weight | 2 g to 900 g per shot |
| Tolerance | ±0.05 mm on mating features, ±0.10 mm general |
| Surface finish | SPI B1 to C1 tool finish, or texture to a supplied standard |
| Colour | Masterbatch matched to a Pantone or supplied sample |
| Packing | Loose in corrugated trays, part number labelled |
Anyone can mould a part. What makes an unassembled supply work is the interface data: the drawing of every mating face, the specified interference or clearance, the torque value on every screw, and the order of assembly. We supply a 2D assembly drawing and a DFM report with the first article, and we flag every feature that can be assembled backwards, because a housing that clips in two orientations will eventually be clipped wrong on a night shift.
Tooling is quoted per part with the steel grade and cavitation stated, typically P20 for 300k shots or S136 for 1M shots where the part is abrasive or needs a polished finish. First article is 25 to 35 days from drawing approval. Repeat orders run without the tooling lead time, and we hold tooling in our own shop rather than the buyer's, which keeps the repeat order a purchase-order decision rather than a tool transfer project.