Our Services
My Traderoom
Mobile 
QR Code 
Cart(0)

Plastic Products

You are now at: Home » Products all 311  Products information,Release today  381 information

Plastic products are the finished and semi-finished goods buyers actually import: housewares, storage and crates, packaging, caps and closures, pipes and fittings, garden and hardware items, toys and promotional goods. Suppliers on China Plastic Factory list the process each item is made by, the material it uses and the tooling situation, so you can judge whether an offer fits your volume before you ask for a price. Compare items, then post a buying request with your target specification.

Category
More
Plastic Cleaning & Bathroom Products(15) Disposable & Food Service Plastics(10) Personal Care & Beauty Plastics(13) Plastic Baby & Kids Products(4) Plastic Pet Supplies(14) Plastic Sports & Leisure(17) Plastic Garden & Outdoor Living(8) Plastic School & Office Supplies(9) Plastic Toys & Games(34) Plastic Packaging(9) Plastic Home Storage & Organization(10) Plastic Bottles & Containers(8)
Area
More
Afghanistan Albania Algeria American Samoa Andorra Angola Anguilla Antarctica Antigua and Barbuda Argentina Armenia Aruba Australia Austria Azerbaijan Bahamas Bahrain Bangladesh Barbados Belarus Belgium Belize Benin Bermuda
Type
Products Services Second Hand Reprocess Partnership Stock Clearance
Filter
Image List  Image&Text List 
Price  Image  VIP     
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
 «Previous   1   2   …   3   4   5   6   7   …   11   12   Next»   Total: 229 items / 12 pages 

What Decides the Price of an Imported Plastic Product

For a plastic product, the unit price is a function of five things far more than of labour: the process, the tooling amortisation, the material, the decoration and the packing. A buyer who understands this can usually find 15–30% between two quotes that look identical on paper.

How Order Volume Changes the Best Process

Annual volumeUsual approachWhat to watch
Under ~2,000 pcsBuy from an existing mould the supplier already runsLimited shape and colour freedom; check the mould's remaining life
2,000–20,000 pcsNew single-cavity or two-cavity injection mouldTooling cost per unit is high; negotiate amortisation terms
20,000–200,000 pcsMulti-cavity mould, optimised cycle timeTool quality and cooling design decide your long-run cost
Over 200,000 pcsHigh-cavity tool, automation, sometimes in-house assemblyLead time risk and tool maintenance planning

Specification Points Buyers Forget

Quality Control on a Plastic Product Order

A practical inspection plan for consumer plastics covers, in order: pre-production sample approval, first-article inspection at the moulder, in-process checks on weight and key dimensions, and a pre-shipment inspection using AQL sampling with a written defect classification. Define critical, major and minor defects yourself — a supplier's definition of "minor" is often wider than yours.

Frequently Asked Questions

Can I order a plastic product without paying for a new mould?

Yes. Many suppliers run catalogue moulds and will produce your quantity in your colour, sometimes with your logo. You avoid tooling cost but accept the existing shape, and you should confirm that the mould is not already being used for a competing brand in your market.

Who owns the mould if I pay for it?

You should, but ownership only exists if the purchase order says so and the tool is identifiable. State ownership, the amortisation method, and the conditions under which the tool can be moved or bought out. Our guide to mould ownership and transfer covers the clauses to fix before you pay.

How long does production take after sample approval?

For an existing mould, production of a few thousand pieces typically runs in weeks, not months, once material is in house. For a new tool, add design review, tool manufacture, trial and correction cycles before production starts. Ask for the timeline as a dated schedule, not as a single number.

Is recycled or regrind material acceptable?

Often yes for industrial and non-food items, and it lowers cost. For food-contact, medical or load-bearing parts, decide in writing what percentage and from which source. Uncontrolled regrind is one of the most common causes of brittle parts and colour drift.

Related Reading

China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
China Plastic Factory B2B advertisement
top